Learning Center · Troubleshooting

Deye Inverter Fault Codes: What F13, F35, F56 and the Others Mean

A Deye fault code is a short message on the inverter screen. F35 means no grid (normal in a brownout), F13 means a mode change that usually clears itself, and F56 means a low battery. Codes about leakage, insulation, polarity or arcs (F01, F16, F23, F24, F63) are safety issues: switch off at the external switches and call your installer. This guide lists 27 codes from Deye’s own manuals, what they mean, and the checks that are safe for an owner.

Updated November 23, 2026 · Codes checked against Deye manuals November 23, 2026 · By the SunTipid team · Not engineering advice

Safety first: read the code, do the simple checks, and stop there. Never open the inverter, touch its terminals or cables, or work on the panels, battery or wiring yourself. Inverters carry dangerous voltage even when they look off. Anything beyond restarting and looking at the display belongs to your installer or a licensed professional electrical engineer (PEE). This guide gives no wire sizes and no breaker ratings.
Codes covered27From 4 Deye user manuals
Safe restartDC off, AC off, wait 1 minThen DC on, AC on
NeverOpen the inverterCall your installer or a PEE
Models4 Deye seriesSG02LP1 manual not checked

What do the most common Deye fault codes mean?

A Deye fault code is the inverter telling you what it noticed, such as no grid, a low battery or too much load. Many are harmless and clear by themselves. The ones that involve leakage, insulation, polarity or arcs are safety issues and need a professional. The tables below group the codes printed in Deye’s manuals, with plain-English meanings and what you can safely check.

CodeShort meaningUsually serious?
F35No gridNo. Normal in a brownout.
F13Working mode changedNo. Usually clears by itself.
F56Battery voltage lowNot usually. Recharge and cut loads.
F18 / F20Over-current (AC / DC)Maybe. Often an overloaded circuit.
F23 / F24Leakage / PV insulationYes. Call a professional.
F64Inverter too hotMaybe. Check ventilation.
F58Battery data link lostNeeds an installer.

Which Deye models does this cover?

We built this from three official Deye manuals: the single-phase SUN-3/6K-SG04LP1, the three-phase SUN-5/12K-SG04LP3 and the single-phase SUN-16K-SG01LP1 (and its siblings). The SG03LP1 manual (SUN-6K) has the same list as SG01LP1. All of these series appear in SunTipid’s Deye parts list. Some codes appear in only one manual, and a note under the tables says which. The SG02LP1 manuals (SUN-10K and 12K) were not checked, so treat them as unconfirmed.

Check your own manual. Codes and firmware vary by model and by region version (EU, AU and others). If your screen shows a code that is not here, we do not have an official meaning for it, so do not guess.

How do you restart a Deye inverter after a fault?

This is the one reset Deye’s manuals describe, and it uses only the external switches:

  1. Note the fault code, the time, and what was running.
  2. Switch off the inverter’s DC switch and AC switch.
  3. Wait one minute.
  4. Switch the DC and AC switches back on and watch the display.

Do not open the inverter, pull connectors or touch the battery terminals. If the same code returns after one or two tries, stop and call your installer.

Grid and utility codes

These mostly describe your electric supply, not your equipment. They are often the first codes owners see, because brownouts and voltage swings are part of life here.

CodeWhat the manual calls itPlain EnglishSafe owner-level checksCall your installer when
F35No AC grid / No utilityThe inverter cannot see the grid.Check whether Meralco power is actually out. Look at the grid breaker and isolator feeding the inverter: are they on? Wait for the grid to return.Power is on in the neighbourhood and the code stays.
F42AC line low voltage / Grid voltage faultGrid voltage is outside the range the inverter accepts.Look at the display for the grid voltage. Check whether other appliances also show low or unstable voltage. Wait a few minutes.It repeats often, or other appliances also misbehave. Ask Meralco about the voltage.
F47AC over frequency / Grid frequency out of rangeThe grid frequency is too high for the inverter.Wait and watch. This is mostly a grid condition, not a fault in your system.It keeps coming back, or the inverter will not restart.
F48AC lower frequency / Grid frequency out of rangeThe grid frequency is too low for the inverter.Wait and watch. Most often it is a grid condition, such as a weak supply.It keeps coming back, or the inverter will not restart.
F13Working mode changeThe grid type or frequency setting changed, or the battery mode was switched to “no battery”. On some older firmware it also appears when the work mode changes.Wait a minute or two. The manual says it generally disappears automatically. If it stays, use the restart steps above.It stays after the restart, or you did not change anything and it keeps returning.

Battery codes

CodeWhat the manual calls itPlain EnglishSafe owner-level checksCall your installer when
F56DC busbar voltage is too low / Battery voltage lowThe battery voltage is too low.Look at the battery percentage on the display. Let solar or the grid recharge it. Reduce loads in the meantime.The battery will not charge, or the code repeats on a battery that should be charged.
F55DC busbar voltage is too high / BUS voltage is too highA voltage inside the inverter is too high. The manual points to the battery or panel input voltage.Note the code and the battery percentage on the display. Reduce loads and restart once.Always. The checks (battery and PV input voltage) need a technician with a meter.
F58BMS communication faultThe inverter lost its data link to the lithium battery’s BMS.Check that the battery is switched on and shows normal on its own display or lights. Note the battery model.Always. Cable and setting checks should be done by your installer.
F46Backup battery faultA problem with the backup battery in a multi-battery bank.Read each battery’s voltage and charge level on its display and note whether they differ.Always. The manual wants every battery’s parameters checked and matched.

Solar panel and leakage codes

Codes in this group relate to electrical safety. Do not keep resetting them.

CodeWhat the manual calls itPlain EnglishSafe owner-level checksCall your installer when
F01DC input polarity reverse faultA panel string is connected the wrong way round.Switch the system off at the external switches and call your installer. Do not open anything.Always, and right away. This happens after installation or rewiring.
F24DC insulation impedance failure / PV isolation resistance is too lowThe panels’ wiring is leaking to ground, which can mean damaged insulation or moisture.Note whether it appears mainly in the rain or morning dew. Do not touch cables or panel wiring.Always. The manual points to PV wiring and ground (earth) connections, which only a qualified person should check.
F23Tz_GFCI_OC (transient AC leakage current) / Leakage current faultThe inverter detected a sudden leakage current.Restart as described above, up to 2 or 3 times as the manual says.It returns after the restarts. Leakage is a shock risk, so involve a PEE.
F16AC leakage current faultA leakage current was detected.Restart as described above, up to 2 or 3 times.It returns. Leakage is a shock risk, so involve a PEE.
F63ARC faultThe inverter suspects an arc on the panel wiring.Switch off at the external switches and keep away from the panel wiring. The manual says arc detection is for the US market, so tell your installer if you see it.Always. Arcs are a fire risk.

Overload and over-current codes

CodeWhat the manual calls itPlain EnglishSafe owner-level checksCall your installer when
F18AC over current fault of hardware / AC side over currentToo much current on the AC side.Turn off big loads, such as aircon, water heater or pump, then restart. Check that the loads on the backup port are within the inverter’s range.It returns even with light loads.
F15AC over current fault of software / AC side over currentToo much current on the AC side, caught by the inverter’s software.Same as F18: reduce loads and restart.It returns even with light loads.
F34AC overcurrent faultToo much load on the backup (UPS) output.Unplug or switch off high-power loads connected to the backup output. Do not move loads between circuits yourself.It returns even with light loads.
F20DC over current fault of the hardware / DC side over currentToo much current on the DC side, for example when a big load starts in off-grid mode.Reduce the load that was starting, then restart. The manual says a large load at startup can cause F20.It repeats, or the PV and battery connections need checking.
F21Tz_HV_Overcurr_fault / BUS over currentA high current surge inside the inverter.Restart up to 2 or 3 times as the manual says.It returns. Your installer should check the PV and battery current settings.
F07DC_START_FailureThe inverter cannot build up its internal voltage from the panels or battery.Restart. Check the display for battery and PV readings.It returns. Do not keep restarting.

Temperature, grounding and other codes

CodeWhat the manual calls itPlain EnglishSafe owner-level checksCall your installer when
F64Heat sink high temperature failureThe inverter is too hot.Check that nothing blocks the vents and the area is shaded and airy. Switch the inverter off for 10 minutes, as the manual says, then restart.It returns, or the heat comes with a smell or discoloration.
F26The DC busbar is unbalancedVoltage inside the inverter is uneven. The manual links it to very different loads or to DC leakage.Wait and see whether it clears by itself. Restart 2 or 3 times as the manual says.It returns, or the display shows it repeatedly.
F08GFDI relay failureA grounding-related relay problem. The manual mentions the backup-load neutral needing to be grounded in split-phase or 120/208 V systems.Note the code. This is mainly an installation matter.Always. It involves grounding and wiring.
F22Tz_EmergStop_Fault / Remote shutdownThe inverter was shut down by a remote command, or it needs the installer to look at it.Check whether anyone switched the system off or an external control is connected.You did not stop it. One manual only says “contact your installer”.
F62DRMs0 stopA utility-control feature (DRM) that applies to Australia only, per the manual.Note the code.If you see it in the Philippines, tell your installer. It may mean a setting is wrong.

Parallel-system codes

Only relevant if two or more inverters are wired to work together.

CodeWhat the manual calls itPlain EnglishSafe owner-level checksCall your installer when
F29Parallel CAN bus faultCommunication between inverters wired in parallel failed.It can appear briefly while a parallel system starts up. Wait until all inverters are on.It stays after all inverters are on.
F41Parallel system stopOne inverter in a parallel group is off, so the others stop.Look at each inverter’s display and see whether one is switched off.All inverters are on and the code remains.

Codes F01, F07, F15, F16, F21, F46, F55 and F62 appear only in the three-phase SG04LP3 manual we checked. F22 is described differently between manuals. All other codes appear in at least two.

When should you call your installer or a PEE?

  • Call right away and keep the system off: F01, F23, F16, F24, F63, or any smell of burning, smoke, heat damage, arcing sounds, or water inside equipment.
  • Call your installer if it repeats: any code that returns after one or two restarts, or any code you do not recognise.
  • Involve a PEE: grounding, leakage, insulation or over-current problems, and any change to the system. Your installer’s warranty may depend on it.
  • Warranty note: Deye’s manual says damage from attempts to modify or repair the product is not covered. Do not open it.

When you call, have these ready, as the manual lists: the inverter serial number, your installer or dealer, the date it started generating, the fault code and indicator lights, and a clear description of what happened. Need an installer? Find installers. Think the system was installed badly? Check our scam guide and Sulit ba? quote checker.

More fault-code guides

Frequently asked questions

What does a Deye inverter fault code like F13 or F35 mean?

The code is a short label the inverter shows on its screen when it detects a problem. F13 means the working mode changed, which usually clears by itself. F35 means the inverter sees no grid, which is normal during a brownout. Find your code in the tables above for its meaning and the checks Deye’s manuals suggest.

How do I restart a Deye inverter safely after a fault?

Deye’s manuals say to switch off the DC switch and the AC switch, wait one minute, then switch both back on. Only use the switches on the outside of the inverter system. Do not open the inverter. If the same code returns after a restart or two, call your installer.

Is it safe to keep using the system with a fault code showing?

Treat it as a warning and keep it simple. If the inverter has stopped, leave it off and call your installer. Never keep resetting a code that keeps coming back, and switch everything off and call an electrician right away if you smell burning, see smoke or discoloration, hear arcing or notice any heat damage.

Why does my Deye inverter show F35 when Meralco is out?

F35 is the manual’s “no AC grid” fault. During a brownout the grid really is absent, so the code is expected. It should go away once power returns. If your power is on and F35 stays, check that the grid breaker and isolator feeding the inverter are on, then call your installer.

What does F58 BMS communication fault mean?

The inverter has lost its data link to a lithium battery’s built-in battery management system (BMS). The manual lists this fault when the “BMS_Err-Stop” setting is active. This is a job for your installer, who can check the communication cable and the settings.

What if my code is not in this list?

Deye’s code list differs between models and firmware versions. This page covers the codes printed in the three manuals we checked. If yours is not listed, write down the code, the model and serial number and the date and time, then send it to your installer or your Deye distributor. Do not guess.

Should I call the installer or a PEE?

Call your installer first, since they know your system and hold the warranty. A licensed PEE should be involved for anything about grounding, leakage, insulation, over-current or other electrical safety, and for any change to the installation.

Planning a Deye build?

See which Deye models fit your bill and how many panels they accept.

See Deye invertersOpen the Builder

Sources and last checked

Checked November 23, 2026. SunTipid is not a law firm or an engineering firm. This is general information, not legal or engineering advice. Fault meanings and checks are paraphrased from the manuals above in our own words. Always follow the manual that came with your inverter.