Start from your Meralco bill, get a hybrid setup that fits, then swap any part. Every change re-checks voltages and limits so the parts work together.

1. Your bill and backup needs

Sample values are filled in. Change them to match your bill.

What you need

kWh used per month
solar panels
usable battery

How we got these numbers
  1. Monthly use. Your bill divided by your rate per kWh.
  2. Daily use. Monthly use divided by 30 days.
  3. Solar panels. Daily use divided by sun hours, then by 0.8. Panels lose about 20% to heat, dust, wiring and the inverter, so we size up to cover that.
  4. Battery. Essential load times backup hours, divided by 0.9. LiFePO4 batteries last longer when you use about 90% of their capacity, not all of it.
  5. Inverter. The smallest popular hybrid inverter that handles your biggest load at the same time ( kW) and your panel size.

These are planning estimates. Your real bill also has fixed charges, and rainy months produce less. Use them to compare options, then ask a licensed electrician to confirm.

Recommended setup

Based on your bill and backup needs. It updates as you change the numbers above.

2. Your build

Swap any part. Checks update right away.

Beta: specs and prices are estimates, still being verified

Planning estimate only. Specs, prices and checks are estimates to help you plan and compare. Always confirm with each product’s datasheet, follow the Philippine Electrical Code, and have a licensed electrician check your design and do the installation. Some shop links may earn SunTipid a small commission at no extra cost to you.