DOE Annex A notice generator

Annex A notice generator for zero-export and micro-solar systems

Fill in the form in about 60 seconds and get a print-ready Annex "A" notification to send your distribution utility (Meralco, VECO, Davao Light or your electric coop). Under DOE Circular DC2026-08-0017, grid-connected zero-export systems and plug-in micro-solar up to 1,000 W DC / 800 W AC notify the utility with this form instead of getting an ERC Certificate of Compliance. Fully off-grid systems do not need it. Everything runs in your browser.

Annex A fields checked against the official DOE circular PDF on November 20, 2026

Make your Annex A notice

The preview on the right is the page that prints. It updates as you type.

Your utility
I. End-user information
II. System information

Fully off-grid (isolated) systems do not need this notice.

III. Declaration
Optional supplementary page

Annex A does not ask for these. They go on a separate page that is not part of the form, in case your utility wants to know what you installed.

Everything stays in your browser. Nothing is uploaded or saved.

To: (Name of Distribution Utility)

Notification of installation of connected Self-Generating Facility Zero-Export Solar System (SGF ZESS) / Micro-Solar System (MSS)

I. End-user information
Name of End-User
Service / Customer Account No.
Service Address
Contact Number
E-Mail Address
II. System information
Self-Generating Facility Zero-Export Solar System (SGF ZESS)
Micro-Solar System (MSS)
Installed PV Capacity (DC)
Installed Inverter Capacity (AC)
Date of Installation
III. Declaration

I hereby notify the ________________________ of the installation of the above-described system. I further declare that the information provided herein are true and correct and that the installation complies, or shall comply, with the applicable requirements of the Department of Energy, Energy Regulatory Commission, and other applicable laws, rules, and regulations.

Signature
End-User’s Full Name
Date

Format follows Annex “A” of DOE Department Circular No. DC2026-08-0017, “Streamlined SGF ZESS and MSS Policy”. Prepared with the free SunTipid notice generator (suntipid.com). This is not an official DOE document.

Which systems need to notify the utility?

Notification depends on your system type. This table comes from Section 4.2 of DOE Circular DC2026-08-0017 (published August 2026, checked November 20, 2026).

RequirementZero-export, connected (SGF ZESS)Zero-export, isolated (SGF ZESS)Micro-solar (MSS)
Written notice to the utility (Annex A)RequiredNot requiredRequired
LGU Building PermitRequired*Required*Not required
ERC Certificate of ComplianceNot required for households, clinics and hospitalsNot required for households, clinics and hospitalsNot required

*A new permit is not required if your LGU verifies that your existing Building Permit is enough. You then submit a copy of it. Micro-solar means up to 1,000 W of panels (DC) and a micro-inverter of up to 800 W (AC) with automatic anti-islanding, connected through a standard outlet or circuit with a PEC-compliant installation (Section 3.2).

How do I send my Annex A notice?

  1. Confirm your category in the table above. If your hybrid inverter is grid-connected with export set to zero, choose the connected zero-export option.
  2. Fill in the form. Use the account number and service address exactly as they appear on your electric bill.
  3. Press Print or save as PDF. Choose Save as PDF in the print window to keep a digital copy, then sign the printed page.
  4. Send it through your utility’s channel (ask about e-mail, branch drop-off or online portal).
  5. Keep a copy with your electrical permit and plans. Section 6.3 says the utility keeps a registry of notified systems.
Not sure about your setup? Size it in the SunTipid Solar Builder, then read the Philippine solar laws guide for permits, net metering and engineer sign-off.

Frequently asked questions

Who has to send the Annex A notification?

Owners of grid-connected zero-export solar systems (SGF ZESS) and owners of micro-solar systems (MSS) must notify their host distribution utility using Annex A (Section 4.2 of DOE Circular DC2026-08-0017). Fully off-grid, isolated systems are not required to submit it.

What does Annex A ask for?

The utility name, your name, service or customer account number, service address, contact number and e-mail, whether the system is SGF ZESS or MSS, installed PV capacity in DC, installed inverter capacity in AC, the date of installation, and a signed declaration with your full name and the date.

Does Annex A ask for the inverter model or the CT limiter?

No. The official form only asks for PV capacity (DC) and inverter capacity (AC). This generator can add a separate supplementary page with your inverter model, panels, battery and export-prevention device, which is not part of Annex A and is optional.

When do I send the notification?

The form is titled as a notification of installation, and Section 6.3 tells utilities to adopt a post-installation notification process. The circular does not state a deadline or a delivery channel, so ask your utility how it wants to receive the form.

Is this the official DOE form?

It follows the wording and fields of Annex A in the circular, but it is generated by SunTipid and is not an official DOE document. Your utility may have its own intake form or channel, so confirm with them before you send it.

Can my utility charge a fee or ask for more clearances?

Section 6.1 directs utilities not to impose administrative barriers, including pre-installation clearances, technical permits or inspection fees, as conditions for installing a zero-export or micro-solar system. A utility may study its own network at its own cost, but the study cannot delay your installation (Section 4.3).

What if my system exports power to the grid?

Power exported by a micro-solar system, or by a zero-export system whose limiter fails, is treated as non-compensated export and earns no bill credit (Sections 4.4 and 5.3). To be paid credits you need net metering with a Net-Metering Agreement. Keep the export limiter working at all times.

What else do I need besides this notice?

A zero-export system, connected or isolated, still needs a Building Permit from your LGU unless the LGU confirms your existing permit is enough. An ERC Certificate of Compliance is not required for households. Micro-solar needs neither. All installs must follow the Philippine Electrical Code (Sections 4.2 and 5.1).

Sources

  • DOE Department Circular No. DC2026-08-0017, “Policy Guidelines for Self-Generating Facility Zero-Export Solar Systems and Micro-Solar Systems for Own-Use”, Sections 3, 4.2 to 4.4, 5 and 6 and Annex “A”: doe.gov.ph (checked November 20, 2026)
  • DOE media release, “DOE Simplifies Rules for Own-Use Solar, Expands Access for Filipino Consumers” (August 20, 2026): doe.gov.ph

Not legal advice. This tool prepares a notification in the format of DOE Annex “A” as of November 20, 2026. It is not an official DOE document and does not guarantee acceptance by your utility. Rules change. Check with your distribution utility, your LGU building official and a licensed electrical engineer before you install.

Need to size a zero-export hybrid system first? Enter your bill in the SunTipid Solar Builder.