Glossary
Philippine Solar & DIY Engineering Glossary
This glossary explains 20 solar terms in plain English, using Philippine examples such as Meralco, 60Hz power and Deye or Solis inverters. Each entry has a short definition, a real-world example and a link to the matching SunTipid tool or guide.
Cold-Morning Voc (1.15x Safety Factor)
Electrical & SizingCold-morning Voc is the highest open-circuit voltage a solar string reaches, because panel voltage rises as temperature falls. Multiply the panel's rated Voc by the string length, correct it for cold, and keep the result under the inverter's maximum DC input. A 1.15x margin is a common rule of thumb.
PH practical example: Dawn in Tagaytay or Baguio can be about 10°C, so a string that reads safe at 25°C may be too high. The Builder checks Voc at 10°C using the panel's datasheet temperature coefficient.
MPPT Current Clipping
Electrical & SizingMPPT current clipping happens when the panels can supply more current than the inverter's MPPT input accepts, so the inverter caps the input and the extra power is lost. It usually costs only a little energy around midday and is not damage, but confirm the datasheet lists a short-circuit current limit.
PH practical example: Pairing a high-current 700 W-class panel with a Deye or Solis hybrid rated for a lower input current per MPPT can clip at noon. The Builder warns you when working current exceeds the MPPT limit.
Peak Sun Hours (PSH)
Electrical & SizingPeak sun hours (PSH) are the number of hours in a day when sunlight averages 1,000 watts per square metre, which equals one kilowatt-hour per square metre. SunTipid assumes 4.5 peak sun hours, then estimates daily output as kWp × sun-hours × 0.8 to allow for losses.
PH practical example: A 5 kWp array at 4.5 sun-hours and 0.8 works out to about 18 kWh a day on paper. Shade, rainy-season clouds and your roof angle can make real output lower.
Balance of System (BOS)
Electrical & SizingBalance of System (BOS) means every part of a solar setup except the panels, inverter and battery. It covers mounting rails, DC and AC cables, breakers, connectors, grounding gear, surge protection and enclosures. These small items add real cost, so a fair quote should list them clearly.
PH practical example: Two Meralco-area quotes can show the same panels and inverter yet differ by tens of thousands of pesos because one leaves out cables, breakers or the mounting structure. Ask for the BOS list.
Zero-Export & CT Clamp
Electrical & SizingZero-export is an inverter setting that stops any solar power from flowing back to the utility grid. A CT clamp, short for current transformer, sits on the main line and measures grid current so the inverter lowers its output before power can leave your home. Exported energy earns no credit.
PH practical example: A Deye or Solis hybrid with a CT clamp at the service entrance lets a Meralco household run solar with no net-metering agreement, as covered by DOE Circular DC2026-08-0017 for zero-export systems.
Single-Line Diagram (SLD)
Electrical & SizingA single-line diagram (SLD) is a simplified one-line drawing that shows how the panels, inverter, battery, breakers, meter and loads connect, with cable and breaker sizes marked. Electrical engineers use it to design and review an installation, and local offices may ask for it with the permit papers.
PH practical example: Your Professional Electrical Engineer seals an SLD for the LGU electrical permit. The Builder shows a reference diagram of typical sizes, not a design specification, to help you talk to your engineer.
Surge Watts vs. Running Watts
Electrical & SizingSurge watts versus running watts compares the brief power a motor draws at startup with the steady power it uses afterwards. Running watts are continuous load. Surge, also called starting watts, can be two to three times higher for compressors, so the inverter must handle both.
PH practical example: A refrigerator or non-inverter aircon compressor may draw a big spike at startup, then settle. Size the inverter's surge rating for the biggest motor, not just the total running load.
Type II DC/AC SPD
Electrical & SizingA Type II DC/AC SPD is a surge protective device installed at the distribution board or inverter to divert voltage spikes, such as lightning-induced surges, away from equipment. Type II units handle surges that reach the installation. The DC side protects the string wiring and the AC side protects loads.
PH practical example: During thunderstorm season, a surge on a Laguna or Cavite rooftop line can reach the inverter. Fit a DC SPD on the strings and an AC SPD at the board, then ground them properly.
60Hz Grid Standard
Electrical & SizingThe 60Hz grid standard means the Philippine power grid runs at a frequency of 60 hertz, with residential service at about 230 volts. Grid-tied and hybrid inverters must match that frequency, and appliances, motors and clocks are designed around it, so always confirm 60Hz output in the datasheet.
PH practical example: Most Deye and Solis hybrid datasheets list selectable 50/60 Hz, so set the inverter to 60 Hz and 230 V before connecting it to a Meralco or electric cooperative supply.
Depth of Discharge (DoD)
Batteries & LiFePO4Depth of discharge (DoD) is the percentage of a battery's total capacity that you actually use before recharging. An 80% DoD means 20% stays in reserve to protect the battery. A higher DoD gives more usable energy but can shorten cycle life, so manufacturers publish a recommended limit.
PH practical example: SunTipid sizes batteries with 80% DoD. A 10.24 kWh 51.2V 200Ah LiFePO4 pack from Shopee or Lazada therefore gives well under its label capacity during a brownout.
C-Rate (0.5C vs. 1C)
Batteries & LiFePO4C-rate is how fast a battery is charged or discharged relative to its capacity. At 1C, a 100Ah battery gives 100 amps; at 0.5C it gives 50 amps. Many LiFePO4 packs are rated 0.5C continuous, so the battery limits how much power the inverter can pull.
PH practical example: A 51.2V 200Ah pack at 0.5C supplies about 100 A, roughly 5.1 kW. A 10 kW inverter on that single pack is limited by the battery, so add packs in parallel.
15S (48V) vs. 16S (51.2V) LiFePO4
Batteries & LiFePO415S versus 16S LiFePO4 describes how many 3.2-volt cells are wired in series: 15 cells make a 48-volt nominal pack and 16 cells make 51.2 volts. Most newer home batteries are 16S. Always check the inverter's battery voltage range and the maker's compatibility list before mixing.
PH practical example: Most 51.2V rack batteries sold in the Philippines are 16S. A 48V hybrid inverter may accept them, but confirm the brand is on the inverter maker's tested list.
BMS Communication (CAN/RS485)
Batteries & LiFePO4BMS communication is the data link, usually CAN or RS485, between a lithium battery's battery management system and the inverter. It lets the inverter read state of charge, voltage and temperature and limit charge current. Without it, many hybrids run the battery blind or refuse to charge it.
PH practical example: Deye hybrids need the battery's protocol selected and the correct communication cable pinout. The Builder only pairs an inverter with batteries whose tested list names the brand.
Usable kWh
Batteries & LiFePO4Usable kWh is the energy you can actually draw from a battery after allowing for depth of discharge and conversion losses. It is smaller than the label capacity. SunTipid multiplies nominal capacity by 0.8 DoD and 0.94 inverter efficiency, which is about 75% of the label figure.
PH practical example: A 10.24 kWh pack gives about 7.7 kWh usable (10.24 × 0.8 × 0.94). That is the number to compare when asking how long the aircon runs during a brownout.
DOE Circular DC2026-08-0017 (SGF ZESS & ≤800W Micro-Solar)
PH Laws & PermittingDOE Circular DC2026-08-0017 is the August 2026 Department of Energy policy for self-generating zero-export solar systems (SGF ZESS) and micro-solar systems used for own consumption. Households need no ERC Certificate of Compliance, and plug-in micro-solar up to 1 kW DC and 800 W AC needs only a utility notice.
PH practical example: A Meralco home with a zero-export hybrid sends a written notice and may not be charged inspection fees. Fully isolated off-grid systems need no notice. A PEC-compliant install is still required.
EO 110 (10-Day Net Metering)
PH Laws & PermittingEO 110 is Executive Order No. 110, series of 2026, signed March 24, 2026. While the national energy emergency lasts, distribution utilities have 10 working days, with no extension, to process net-metering applications instead of the usual 20. Net metering credits exported power at the utility's generation cost.
PH practical example: A Meralco net-metering applicant who submits the four required documents can expect the utility's decision within 10 working days. If the emergency ends, the deadline returns to 20 working days.
CFEI (Certificate of Final Electrical Inspection)
PH Laws & PermittingA CFEI, or Certificate of Final Electrical Inspection, is the document your local Office of the Building Official issues after inspecting the finished electrical installation. Net-metering applicants submit it to the utility. LGUs are expected to release it within 7 working days or the request is deemed approved.
PH practical example: After your installer finishes, the Building Official in your city inspects the system and issues the CFEI. Send it to Meralco or your cooperative with the other net-metering documents.
PEE vs. RME Sign-Off
PH Laws & PermittingPEE and RME are two kinds of electrical licence in the Philippines. A Professional Electrical Engineer (PEE) is the licensed professional who designs the system and signs the plans. A Registered Master Electrician (RME) is licensed for hands-on installation work. Requirements differ by LGU and utility, so ask which one they need.
PH practical example: For net metering or an electrical permit, ask your utility and LGU who must sign your plans. Whatever they say, have a licensed PEE review your design before you connect anything.
Street Price vs. Turnkey Quote
Pricing & QuotesStreet price versus turnkey quote compares what parts cost on a shop shelf or online with what an installer charges for everything. Street price covers only the panels, inverter or battery. A turnkey quote adds mounting, cables, breakers, labour, permits and warranty support, so it is normally higher.
PH practical example: A Lazada or Shopee listing for an inverter is a street price. An installer's turnkey quote for the full system includes the BOS, installation and paperwork. Compare line by line.
Cost per Watt (₱/Wp) & Cost per Usable kWh (₱/kWh)
Pricing & QuotesCost per watt (₱/Wp) is the total system price divided by the solar array's peak watts. Cost per usable kWh (₱/kWh) is a battery's price divided by its usable energy. Both let you compare quotes of different sizes fairly, instead of judging by the total price alone.
PH practical example: Illustrative only: ₱200,000 for a 5,000 Wp system is ₱40/Wp. A ₱50,000 battery with 7.7 usable kWh is about ₱6,500 per usable kWh. Use your own quotes.
No terms match. Try a shorter word or choose All.
How to use this glossary: these definitions help you plan and talk to suppliers. Rules and prices change, and our numbers are estimates. Check the Philippine Electrical Code and your utility, and ask a licensed PEE to review and seal your plans before installation.