Learning Center · Business and batteries

Solar for a Coffee Shop or Night-Operating Business in the Philippines: Battery Size, Rates and Permits

A business that works after dark should size the battery first: night kWh ÷ 0.752. Our example café, open 3 pm to 3 am, uses 30.5 kWh a day, 80% at night, so it needs about 32.6 kWh of battery and 10.7 kWp of panels. At typical catalog prices the battery is 47% of main-parts cost. The Builder is a home tool, so use it only as a first pass.

Updated November 27, 2026 · Rates checked November 27, 2026 · By the SunTipid team · Planning estimates only

Planning example, not a design. Loads are our assumptions and prices are typical catalog estimates from November 20, 2026. Ask a licensed PEE to check the design for your own site.
Example night share80%24.5 of 30.5 kWh a day, 5 pm to 7 am
Battery needed32.6 kWhNight kWh ÷ 0.752
Panels10.7 kWp17 × 630 W, Recommended rule
Battery share of cost47%₱170,000 of ₱361,400 main parts

Can a coffee shop or other night-operating business run on solar?

Yes, but the battery decides the project. A business that works after dark uses most of its power when the panels are off, so you size the battery for the night kWh first: night kWh ÷ 0.752. In our worked example, a small café open 3 pm to 3 am uses about 30.5 kWh a day, 80% of it at night, and needs about 32.6 kWh of battery and 10.7 kWp of panels. At typical catalog prices the battery is about 47% of the main-parts cost. This is a planning example, not a design.

Planning estimates only. The load figures below are assumptions we chose, not measurements, and prices are typical catalog estimates from November 20, 2026. For your own shop, ask a licensed professional electrical engineer (PEE) to check the load and the design before you buy or connect anything.

If you are looking at a home where the family sleeps in the day and works at night, read our separate guide on solar for a home that uses most power at night. This page is for shops and small businesses.

How does a night-operating business read its load?

Split your use into daytime (7 am to 5 pm) and night (5 pm to 7 am), then list what runs in each. The same four things usually decide the answer:

  • Aircon. Often the largest single load, and for most shops it runs for every open hour.
  • Refrigeration. Chillers and freezers run 24 hours, so the night hours always carry a share.
  • Lighting and signage. Almost all of it falls after dark.
  • POS, router and small electronics. Small, but constant while you are open.

To find your real figures, ask Meralco for your monthly kWh history, read the meter at the start and end of a normal opening day, or fit a clamp-on logger through your electrician. A monthly bill shows one total, so it cannot tell you the night share on its own.

BusinessWhat runs at nightWhat usually dominates the night load
Coffee shop, bar, restaurantAircon, lights, espresso or kitchen gear, chillersAircon and refrigeration
24-hour convenience storeChillers, freezers, lights, aircon, POS, CCTVRefrigeration, which never switches off
Internet cafe, gaming hubDozens of PCs, aircon, router, lightsPCs and aircon, both at high load
Call center, BPO satellite officePCs, aircon, servers, lightsAircon and IT load, often well above 5 kW
LaundromatWashers, dryers, water heatingDryers and heaters, usually the largest single loads
Clinic, pharmacy, water stationRefrigeration, lights, pumpsRefrigeration and pump starting current

What does a small coffee shop look like in numbers?

A small coffee shop’s solar numbers start from an example café we built with clearly stated assumptions: open 3 pm to 3 am, one 1.5 HP inverter aircon, a small espresso setup, a fridge, freezer and display chiller, LED lighting and a basic POS. Every figure below is an assumption you should replace with your own.

Load (assumed)Average draw while onHours a daykWh a dayOf which night (5 pm to 7 am)
1.5 HP inverter aircon0.9 kW12 (open hours)10.89.0
Espresso machine and grinder0.4 kW124.84.0
Fridge, freezer and display chiller0.25 kW246.03.5
Lights and signage0.35 kW10 (after dark)3.53.5
POS, Wi-Fi, speaker, chargers0.15 kW121.81.5
Kettle, ice maker, blender0.3 kW123.63.0
Total30.5 kWh24.5 kWh (80%)

Assumptions, not measurements. Daytime means 7 am to 5 pm, the same split we use in the home guide. Open hours: 2 hours in the daytime window, 10 hours at night.

That is 30.5 kWh a day, about 915 kWh a month, with 24.5 kWh (80%) after 5 pm. Here is how we size it, using the same rules the Builder uses for homes (4.5 sun hours, 0.8 derate, 25% rainy-season cushion, battery divided by 0.752; daily production is kWp × 4.5 sun-hours × 0.8, and without net metering the solar you can use is limited by battery size and daytime load, with shade lowering output):

StepWorkingResult
Night energyFrom the load table24.5 kWh a day
Battery label needed24.5 ÷ 0.75232.6 kWh
Real batteries2 × 16.08 kWh (catalog: Mason 314L)32.2 kWh, about 1% short
Panels, Recommended rule30.5 ÷ (4.5 sun hours × 0.8) × 1.2510.6 kWp, so 17 × 630 W = 10.7 kWp
Daily energy checkDirect 6.0 + battery charging 24.5 ÷ 0.94 = 32.1 kWh needed vs 10.7 kWp × 3.6 = 38.6 kWh madeAbout 20% to spare on an average day
InverterWorst-case peak about 7.4 kW × 1.2510 kW class, single phase

We did not run this through the Builder, which is built for homes. We worked it by hand from the Builder’s rules and our own catalog. The worst-case peak of about 7.4 kW assumes the aircon (1.4 kW), espresso machine (2.2 kW), kettle (1.8 kW), blender (0.6 kW), grinder (0.4 kW), chillers (0.5 kW with starting current), lights (0.35 kW) and POS (0.15 kW) all run at once. A real shop may peak higher or lower.

Why does battery size dominate the cost?

Panels make power only in the day, so everything the shop uses after 5 pm has to come from storage. In this example the battery needs more than five times the kWh the shop uses directly in the daytime (32.6 vs 6.0 kWh). At catalog prices:

Main part (catalog typical price, November 20, 2026)QuantityPriceShare
JA Solar JAM72D42-630/LB panel17 × ₱6,200₱105,40029%
Deye SUN-10K-SG02LP1-EU hybrid inverter (13 kW max PV)1 × ₱86,000₱86,00024%
Mason 314L 16.08 kWh battery2 × ₱85,000₱170,00047%
Main parts subtotal₱361,400100%

Catalog typical prices dated November 20, 2026. Excludes mounting, cabling, breakers, surge protection, labor and permits. Estimates, not a quote. Catalog prices for batteries run from about ₱5,300 to ₱6,400 per kWh of label capacity, so the battery line could be roughly ₱170,000 to ₱210,000.

The battery alone (₱170,000) costs almost as much as the panels and inverter together (₱191,400). That is why it pays to measure the night load carefully. A 10% error in night kWh changes the battery by about 3 kWh, roughly ₱17,000 at the prices above. Battery size also has practical limits: the inverter must accept the battery’s communication and current, and the number of units that can be paralleled is limited, so ask a licensed PEE to check the pairing. Our Deye battery communication guide explains the pairing side.

What could the shop save?

If the system covered all 915 kWh a month at Meralco’s November 2026 overall residential rate of ₱15.551 per kWh, the bill would fall by about ₱14,230 a month. That is a ceiling. Rainy weeks, a battery that does not recharge fully and loads the system cannot carry all lower the real figure. The table adds a 25% allowance for mounting, cabling, protection, labor and permits, which is our assumption.

Share of the night and day load the system coversSaving a month at ₱15.551 a kWhYears to repay ₱451,750*
100% (ceiling)₱14,230about 2.6
80%₱11,384about 3.3
60%₱8,538about 4.4

*₱361,400 main parts plus a 25% allowance (₱90,350) = ₱451,750. Assumes the residential rate; your business rate and VAT treatment may differ, so use your own bill. Excludes battery replacement and maintenance.

How do commercial electricity rates compare with residential?

Meralco does not publish a single commercial rate per kWh in its monthly press release. The release for November 2026 quotes only the typical household rate: ₱15.5510 per kWh, up ₱0.4895 from October. The full November 2026 rate schedule shows how each class is billed:

Meralco class (November 2026 schedule)Who it is forHow the schedule bills itGeneration charge
ResidentialHomesPer kWh, in consumption tiers₱10.6349 per kWh
General Service A (GS-A)Non-residential, connected load under 5 kWPer kWh, in four tiers. The per-kWh figures match the residential tiers in the schedule₱10.6349 per kWh
General Service B (GS-B)Demand from 5 kW up to 40 kWAdds per-kW demand charges and monthly per-customer charges₱10.6349 per kWh
General Power, medium to extra largeDemand of 40 kW and upPer-kW demand charges, monthly charges and a power-factor adjustment₱10.6349 per kWh

What this means for a night-operating shop:

  • The schedule is quoted without VAT. It lists VAT components such as 9.65% on generation and 11.99% on transmission, and an energy tax that applies to residential customers only. Ask your accountant how VAT applies to your business.
  • Bigger shops pay for demand. General Service B and above add per-kW charges. A battery might lower the demand the utility meters, but how Meralco measures it is not something we have verified, so ask Meralco or your PEE.
  • Use your own effective rate. Divide the total amount due on your latest bill by the kWh. That is the number to put into any payback sum. See our electricity rates page for the residential figures we track.

What are the limits of the Builder for a business?

The Builder is a home tool. It starts from a monthly kWh figure, sizes single-phase systems, and prices your savings with residential-style rate tables. It leaves out three-phase inverters, so it cannot recommend a system for a three-phase supply. Use it for a quick first look at a small shop (you can enter your monthly kWh), then treat the result as a rough guide only.

Ask a licensed PEE for a load study if: your supply is three-phase, you run large compressors, dryers or pumps, your demand is above 5 kW, you have several chillers or freezers, or the shop is part of a larger building. Motors have starting currents that a simple kWh sum does not show, and a wrong inverter or battery pairing is costly.

What about net metering for a business?

Net metering lets a qualified end-user with solar of up to 100 kW export extra power to the utility and receive a peso credit on the bill. In April 2026 the DOE ordered distribution utilities and electric cooperatives to finish processing within 10 working days, down from 20, and told LGUs to act on related permits within 3 working days (GMA News, April 1, 2026). In 2025 the ERC also let users bank and roll over credits, transfer credits to a new owner, and made renewable energy certificate meters optional (pv magazine, September 15, 2025).

For a night-operating shop, the catch is the credit rate. Meralco has said exports offset only the generation part of the bill, not the full retail rate (a Meralco statement reported by Power Philippines on November 18, 2019, so check the current treatment with your utility). So a unit exported at noon is worth less than a unit bought at midnight. With a battery, you keep that noon power and use it at night, which is why the battery is worth more here than exporting. Read our net metering guide for the home view.

Not final. In July 2026 the ERC was proposing further changes to its net metering rules, including shorter timelines and multi-site crediting (pv magazine, July 13, 2026). Check what is in force with your utility before you rely on any of it.

What permits and checks apply to a business?

The government steps we could source are the utility and LGU timelines above. Everything else in this list is a question to ask, not a verified requirement:

CheckWhy it mattersStatus
Utility interconnection and net metering applicationNeeded before you export to the gridSourced: DOE says utilities must process within 10 working days (GMA News, April 1, 2026)
Local government permits for the solar workLocal permits are part of the approval chainSourced: DOE says LGUs must act on related permits within 3 working days (same article)
Plans signed by a licensed PEECommercial work usually needs signed electrical plansUnverified: confirm with your city or municipal office and your PEE
Fire safety rules for a battery room or wallLarge lithium batteries may raise fire-code questionsUnverified: ask your local Bureau of Fire Protection office
Landlord or building administrator consentRoof, wall and meter access sit with the ownerNot a government rule: read your lease and ask in writing
Sub-metered tenantsIf the landlord sub-meters you, you may not hold a Meralco account of your ownUnverified: ask Meralco whether a sub-metered tenant can apply
Your insurerPolicies can change when a new energy system is installedNot a government rule: tell your insurer before you connect

Take the list to a licensed electrician or PEE and ask them to confirm what applies in your city. For a quote check, use Sulit ba?

How do you run your own numbers?

Running your own coffee shop solar numbers takes five steps, starting with your monthly kWh and effective rate from the last three bills:

  1. Get your monthly kWh and your effective rate from the last three bills.
  2. Split the day into daytime (7 am to 5 pm) and night (5 pm to 7 am) and list each load with its hours, as in the table above.
  3. Divide your night kWh by 0.752 for the battery label you need, and size the panels from your daily total using our rainy-season sizing guide.
  4. Try a first pass in the Builder and the battery calculator.
  5. Ask a licensed PEE for a load study and a design for your own site before you buy anything.

Aircon is the usual big night load, so also read our guides on solar for aircon and battery runtime on an aircon.

Frequently asked questions

Can a coffee shop that opens at night use solar?

Yes, but solar alone covers only the hours when the sun is up. A shop that opens in the afternoon and closes after midnight needs a battery for most of its use. In our example café about 80% of the day’s 30.5 kWh falls between 5 pm and 7 am, so the battery, not the panels, is the biggest part of the bill of materials.

How big a battery does a night-operating business need?

Add up the kWh used between 5 pm and 7 am and divide by 0.752 (80% usable battery times 94% inverter efficiency). The example café uses 24.5 kWh at night, so it needs about 32.6 kWh of battery on the label. Measure your own night kWh first, because aircon and refrigeration vary a lot between shops.

Is the electricity rate for a business higher than for a home?

Meralco’s November 2026 schedule shows the same generation charge of ₱10.6349 per kWh for the residential and commercial classes, and General Service A, for non-residential sites under 5 kW, shows the same per-kWh tiers as residential. Larger sites are billed with per-kW demand charges and monthly charges, and the schedule is quoted without VAT. Meralco’s press release gives only a residential overall rate (₱15.5510 per kWh), so work out your own effective rate by dividing your bill’s total by the kWh.

Can I use the SunTipid Builder for my shop?

Use it only as a rough first pass. The Builder is a home tool: it works from a monthly kWh figure, sizes single-phase systems, and uses residential-style rate tables. It leaves three-phase inverters out. If your shop is large, three-phase, or has big motors or compressors, ask a licensed PEE for a proper load study.

Does net metering work for a business?

Net metering is open to qualified end-users with solar up to 100 kW, and the DOE ordered utilities to process applications within 10 working days in April 2026. Exports are credited at a lower, generation-based rate than the retail price you pay on imports, so for a business that uses most power at night, a battery is usually worth more than exporting. Confirm the current credit rate and your eligibility with your utility.

Do I need a permit to install solar at my business?

Expect to deal with your utility, your local government and your landlord. DOE has said LGUs must act on solar-related permits within 3 working days, but the exact documents differ by city. Ask your licensed PEE which plans, permits and fire-safety approvals apply to your own site before you buy anything.

What if my shop is rented?

Get written consent from the lessor before you put anything on the roof or wall, and ask whether you have your own Meralco meter or are sub-metered by the building. Net metering and savings both depend on that answer, and we have not verified how sub-metered tenants are treated.

Run a night business? Start with the night kWh

Measure your night load, size the battery first, then take the numbers to a licensed PEE.

Open the BuilderBattery calculator

Sources and last checked

Checked November 27, 2026. SunTipid is not a law firm or an engineering firm. This is general information, not legal or engineering advice. Ask a licensed PEE to review your own installation.

Leave a Comment