A home solar system is wired as a chain: panels, then a DC breaker and surge protector, then the inverter. A hybrid system adds a battery with its own breaker or fuse, an AC output to the house panel and DU meter, a backup loads panel and one earth bar tying it all together. This guide explains the parts and the power path. It is not an installation guide: a licensed PEE must design and sign off the real system.

Updated November 23, 2026 · Rules checked November 23, 2026 · Pending technical review by a licensed electrical engineer · By the SunTipid team · Not engineering or legal advice

Read this first. This is an overview of how a home solar system is wired, so you can understand quotes and talk to your engineer. It is not an installation guide and it gives no step-by-step wiring or energizing instructions. Solar wiring involves live DC voltage and large battery currents. Under the Philippine Electrical Code (PEC) and RA 7920, the electrical plans must be designed and signed by a licensed professional electrical engineer (PEE), and your distribution utility (DU) must be told before a grid-connected system goes live. Technical review by a licensed electrical engineer is pending.
Step 1Panels, DC protectionBreaker, isolator, surge protector
Step 2Inverter and batteryBattery has its own breaker or fuse
Step 3AC sideHouse panel, DU meter, backup panel
AlwaysPEE sign-offPlans, PEC, DU notice

How is a home solar system wired?

Follow the power. Sunlight hits the panels, which make DC electricity. That DC travels through a breaker or isolator and a surge protector into the inverter. The inverter turns it into the 230 V AC your appliances use. In a hybrid system it also charges a battery through a separate battery breaker or fuse, sends spare power to your house panel, and feeds a small backup loads panel when the grid is down. Everything metal is bonded to one earth bar.

Short version: panels, then DC protection, then the inverter. The battery hangs off the inverter with its own protection. The AC side goes to the house panel and the DU meter. Earthing ties it all together.

What does the full power path look like?

This diagram shows a typical hybrid system. Real systems vary by inverter brand (for example, some inverters already include a DC switch or surge protection), so use it to understand the idea, not as a drawing to build from. The numbers match the table in the next section.

Power path of a typical home hybrid solar systemSolar panels feed a DC breaker and surge protector, then a hybrid inverter. The battery connects to the inverter through its own breaker or fuse. The inverter outputs to the house panel, an AC surge protector and the bidirectional DU meter, and to a backup loads panel. Everything is bonded to one earth bar.Typical hybrid system: the power path (concept diagram, not a design)No wire sizes or breaker amps here on purpose. A licensed PEE chooses them for your exact equipment.in strings (series)Solar panels1DC breaker/ isolator2DC surgeprotector3Hybrid invertersolar charge control (MPPT)converts DC to ACcharges and uses the batterydisconnects from grid if it fails4PV inBATGRIDLOAD / EPSBattery(LiFePO4)BMS inside5Batterybreaker / fuse6BMS cable (CAN/RS485)AC gridbreaker7House panel(existing)main breaker + circuits8DU meterBidirectional (net)meter: import/export9to gridAC surge protector(Type II)13Backupbreaker + RCD10Backup loads panelfridge, lights, router,fans (essentials only)11Main earth bar and ground rod: every metal frame, inverter body and surge protector bonds herepanel frames12Neutral-earth connection: must follow the inverter manual and local code.Additional disconnects, rapid shutdown, transfer devices, SPDs or protection devices may be required by local code, utility rules and equipment manuals.DC powerAC power 230 VCommunicationEarthingNumbers match the table below

Swipe sideways on a phone to see the whole diagram.

What does each part in the diagram do?

#PartWhat it doesWhere it sitsWho handles it
1Solar panels (in strings)Make DC power from sunlight. Panels in a string are joined in series, so their voltages add up.On the roofMounting can be DIY-friendly. Connections and string layout follow the engineer’s plan.
2DC breaker or isolatorLets the panel side be switched off and protects the cable. Many designs have one per string or pair of strings.Between panels and inverterPEE chooses type and rating
3DC surge protector (SPD)Diverts lightning and surge spikes to earth instead of through your inverter.Near the inverter on the panel side, tied to earthPEE and electrician
4Hybrid inverterConverts DC to AC, charges the battery, decides where power goes, and disconnects from the grid if the grid fails. Has inputs for panels and battery and outputs for grid and backup.Indoors or sheltered, near the battery and house panelInstalled to the maker’s manual by a qualified person
5BatteryStores solar energy for night and brownouts. Lithium (LiFePO4) packs have a built-in BMS that protects the cells and talks to the inverter.Cool, ventilated, dry spaceInstalled to the maker’s manual
6Battery breaker or fuse (key protection)Batteries can push very large current in a short circuit, so this device protects the cable and lets you isolate the battery.Right next to the battery, on its DC cablePEE chooses type and rating
7AC grid breakerProtects the cable between the inverter and the house panel and works as the AC isolator for the inverter.At the inverter’s grid outputPEE and electrician
8House panel (existing)Your normal main panel and circuits. The inverter becomes an extra power source feeding it.Existing locationExisting capacity must be checked by the PEE
9DU meter (bidirectional, net meter)The utility’s meter, installed or changed by your DU. A bidirectional (net) meter records import and export. Needed for net metering.Utility side of your main breakerYour DU
10Backup breaker and RCDProtects the backup output cable. An RCD trips on earth leakage to reduce shock risk. The type needed depends on the inverter manual.At the inverter’s LOAD/EPS outputPEE and electrician
11Backup loads panelHolds only the essential circuits that stay on in a brownout.Next to the house panelElectrician, from the PEE’s plan
12Earth bar and ground rodOne common earth point. Panel frames, the inverter body, battery rack and surge protectors all bond to it so fault current has a safe path. How the neutral is bonded to earth must follow the inverter manual and local code.At the building’s earthing pointPEE and electrician, to the PEC
13AC surge protector (Type II)Protects the house wiring and inverter AC side from surges, with its own breaker per the maker. Tied to earth.Near the house panelPEE and electrician
About sizes. Wire sizes and breaker amps depend on your exact panels, inverter, battery, cable lengths and site. We keep them out of this guide on purpose. The Builder shows a wiring and protection diagram with values for the parts you picked, clearly marked as a recommended starting point, not an installation spec. Additional disconnects, rapid shutdown, transfer devices, SPDs or protection devices may be required by local code, utility rules and equipment manuals. Your PEE must check every value against your inverter manual and the PEC.

How is grid-tied wiring different from hybrid and off-grid?

The three types share the same front end: panels, DC protection, inverter. They differ in what is connected on the other side.

Grid-tied, hybrid and off-grid solar comparedThree rows. Grid-tied has panels, a grid-tie inverter, the house panel and the grid, with no battery. Hybrid adds a battery and a backup loads output. Off-grid has panels, an inverter and a battery with no grid connection.Grid-tiedNo battery.Shuts off in a brownout(anti-islanding).PanelsGrid-tie inverterHouse panelGridHybridBattery plus grid.Essential loads keep runningin a brownout.PanelsHybrid inverterHouse panelGridBatteryBackup loadsOff-gridNo utility connection.The battery covers the night.PanelsOff-grid inverterAll house loadsBattery
Grid-tiedHybridOff-grid
BatteryNoYesYes
Connected to the DU gridYesYesNo
Works in a brownoutNo: it shuts off (anti-islanding)Yes, for the backup loadsYes, it never depended on the grid
Utility paperworkNet metering, or zero-export with a DU noticeNet metering, or zero-export with a DU noticeNo DU notice for a stand-alone off-grid system (DOE DC2026-08-0017)
Wiring complexityLowestMedium: adds the battery and backup loads panelMedium to high: the battery and inverter carry every load
Best forDaytime bill savings where the grid is reliableSavings plus backup, the common DIY choicePlaces with no grid

If you are not sure which fits you, read Hybrid vs grid-tie vs off-grid. If you want the simplest legal path for a connected system, see zero-export solar.

Why is the panel side the one to respect most?

  • You cannot switch panels off. They make voltage whenever there is light, even with the inverter off.
  • Strings add voltage. The more panels in series, the higher the voltage, and cold mornings push it higher still. It must stay under the inverter’s limit.
  • DC arcs are stubborn. Unlike AC, a DC arc does not die out by itself, so connectors and protection matter a lot.
  • Roof work is dangerous. Falls are a real risk. See our DIY solar tools guide for the safety gear list.

Why does the battery get its own breaker or fuse?

A battery can deliver far more current in a short circuit than the grid-fed circuits in your house are used to. The breaker or fuse sits close to the battery so a fault in the cable is cut off at the source, and it gives you a safe way to isolate the battery for service. The BMS cable (often CAN or RS485) is a signal link, not a power cable: it lets the battery tell the inverter how much it can charge or discharge. Use the cable and settings your inverter and battery makers approve.

What happens on the AC side?

The inverter’s grid output goes through an AC breaker to your house panel, and the DU’s meter sits on the utility side. The inverter’s backup output (LOAD or EPS) goes through its own breaker, usually with an RCD, to a small panel for essential circuits. Two practical points: the house panel and its main breaker must be able to take an extra source, and most hybrid inverters switch the backup output internally, so a homemade changeover switch is not needed and can be unsafe. Both are your PEE’s call.

What is earthing for?

Earthing gives fault current and surge energy a safe path to the ground. It helps breakers trip, keeps metal frames from staying live in a fault, and lets surge protectors do their job. In a good design, panel frames, rails, the inverter, battery rack and surge protectors all connect to one common earth point. How the neutral is bonded to earth must follow the inverter manual and local code. The PEC (Article 6.90 covers solar PV) sets the rules, and the PEE specifies the details.

What do the rules say?

  • Plans: RA 7920 requires electrical plans to be signed and sealed by licensed professionals. Some LGUs ask for a PEE seal for larger loads.
  • Code: the Philippine Electrical Code (PEC 2017) applies to all installs, including off-grid and hybrid.
  • Grid-connected zero-export: under DOE DC2026-08-0017, a connected zero-export system needs an export limiter or isolation, and you notify the DU. Stand-alone off-grid needs no DU notice.
  • Net metering: up to 100 kW, under an agreement with your DU. Exported power without an agreement earns nothing.
  • DU timing: the DU has 10 working days to process interconnection under the latest reported directive. Confirm with your DU.
  • Micro-solar: up to 1,000 W of panels (800 W micro-inverter) is plug-and-play with a written DU notice, no building permit and no ERC certificate.

Details are in our solar laws page, the permits guide and the net metering guide.

What if I want to add panels or a battery later?

Treat any change as a new design. More panels change string voltage and current, and may need different breakers, wires, surge protection or inverter inputs. More batteries change the battery breaker and cable. Ask your PEE to re-check the design and update the sealed plans before you buy.

What should I ask my electrician or engineer?

  1. Who designs and seals the plans, and what is their PRC license number?
  2. Can I see the single-line diagram, with every breaker, SPD and earth point on it?
  3. Is the house panel’s main breaker and busbar OK with the added inverter?
  4. Which loads are on the backup panel, and what is the backup runtime?
  5. What happens in a brownout, and how do I shut the system down in an emergency?
  6. How will everything be labelled?
  7. What will the LGU inspector check, and who attends?

Not sure what fault codes mean once it is running? See our Deye, Growatt, Solis and GoodWe guides.

Frequently asked questions

How is a home solar system wired in simple terms?

Panels send DC power through a breaker or isolator and a surge protector into an inverter. The inverter turns it into AC for your house. With a hybrid inverter, a battery connects to the inverter through its own breaker or fuse, and the inverter has a second output for backup loads. Every metal part is bonded to one earth point.

Do I need a separate DC breaker between the panels and the inverter?

Most designs include a DC disconnect or breaker on the panel side so the inverter can be isolated safely, and many inverters also have a built-in DC switch. Whether you need an extra one, and its rating, is for your PEE to decide from your inverter manual and the PEC.

What is the backup loads panel?

It is a small panel that holds only the circuits you want to keep alive in a brownout, such as the fridge, lights, router and fans. It is fed from the hybrid inverter’s backup (LOAD or EPS) output. Heavy loads like aircon or a water heater usually stay on the main house panel unless the system is sized for them.

Can I just plug a hybrid inverter into my house panel?

No. The connection to your house panel needs a correctly rated breaker, a check that the panel and its main breaker can take the added source, and the right protection, all under the PEC. This is exactly the kind of detail your PEE signs off on. Do not improvise it.

Why does my grid-tie solar system shut off during a brownout?

Anti-islanding. A grid-tie inverter must stop when the grid goes down, so it never pushes power into lines that utility workers think are dead. To keep power in a brownout you need a hybrid or off-grid inverter with a battery.

What is the DU meter for?

It is the utility’s meter. If you export power under a net-metering agreement, a bidirectional (net) meter records what you take from and send to the grid. Under the 2026 DOE zero-export rule, power exported without a net-metering agreement earns nothing, which is why zero-export systems limit exports.

What happens if I add more panels later?

More panels change the string voltages and currents, and may need different breakers, wires, surge protection and even another inverter input. Have your PEE re-check the design before you add anything.

Where can I see wire sizes and breaker ratings for my build?

The Builder shows a wiring and protection diagram for your parts, labelled as a recommended starting point, not an installation spec. Your engineer must check every value against your inverter manual and the PEC before anything is bought or built.

See the wiring for your own build

Pick your bill in the Builder and open the wiring and protection diagram, then take it to your PEE.

Open the BuilderFind installers

Sources and last checked

Checked November 23, 2026. SunTipid is not a law firm or an engineering firm. This is general information, not legal or engineering advice. This overview gives no installation steps and no wire sizes or breaker ratings. A technical review by a licensed electrical engineer is pending.

  • Philippine Electrical Code 2017, Article 6.90 (solar PV).
  • RA 7920, New Electrical Engineering Law.
  • DOE Department Circular DC2026-08-0017, from the DOE circular page.
  • DOE legacy page on LGU permits: legacy.doe.gov.ph/node/3850.
  • Your inverter and battery installation manuals, which override any general guide.