Zero-Export Solar in the Philippines: The Simplest Legal Way to Go Solar

A zero-export solar system is an own-use system that sends no power to the grid. Under DOE Department Circular DC2026-08-0017 (August 2026), households get the ERC certificate of compliance waived. If you stay connected to the grid you send your electric company a one-page notice, and if you go off-grid you send nothing. You still need a building permit (unless your LGU says your current one covers it) and an installation that follows the Philippine Electrical Code. Anything you accidentally export earns nothing.

Updated November 22, 2026 · Rules checked against the official circular November 22, 2026 · By the SunTipid team · Not legal advice

Size limitNoneAny size, own use only
ERC certificateWaivedFor households
DU paperwork1-page noticeIf grid-connected
Export credit₱0Without a net-metering agreement

What is a zero-export solar system?

A zero-export solar system, or ZESS, is a solar system you build for your own use. It does not push electricity into the grid. The DOE recognizes two kinds:

  • Connected ZESS. Wired to your electric company’s grid, with a control or isolation setup that stops exports. This is how a grid-tied or hybrid build with an export limiter works.
  • Isolated (off-grid) ZESS. Not connected to the grid at all.

There is no size cap on a zero-export system. The circular covers any capacity, which is a big difference from net metering, which is limited to 100 kW. The rules were issued in August 2026 as DOE Department Circular DC2026-08-0017, and they took effect on publication.

What does the 2026 rule require?

The circular sorts own-use solar into three groups. This table follows its own summary of who needs what.

RequirementConnected zero-exportOff-grid (isolated)Micro-solar (1 kW or less)
Written notice to your DURequiredNot requiredRequired
Building permitRequired, unless your LGU confirms your existing permit covers itRequired, same exceptionNot required
ERC certificate of complianceWaived for households, clinics and hospitalsWaived for households, clinics and hospitalsNot required
Paid for exported powerNoNot applicableNo
The big win for homes: the ERC certificate of compliance is waived for zero-export systems used by households. Businesses are not covered by that waiver.

What can your electric company NOT do?

The circular lists limits on the DU. In plain words:

  • It cannot ask for pre-installation clearances, technical permits or inspection fees as a condition for your install.
  • It can run its own distribution impact study if it wants, but at its own cost, and the study cannot delay or block your installation.
  • It cannot shrink your transformer or service drop capacity just because you installed solar. You keep full grid backup for when your solar system is down.
  • It must keep a registry of notified systems and update its citizen’s charter.

How to go zero-export, step by step

  1. Size the system for your own use. Start with the SunTipid Builder or one of the bill-size guides.
  2. Get a design that follows the PEC. The circular repeats that the Philippine Electrical Code applies, and the code says electrical specifications in a permit are signed and sealed by a professional electrical engineer (PEE). Ask your LGU what size of system needs the seal.
  3. Get your building permit, or ask your LGU to confirm in writing that your existing permit already covers the solar work.
  4. Install the system with a working export control. For a grid-connected system this is a limiter or isolation setup that keeps power from flowing out. Ask your installer to show you how it works.
  5. Send your DU the Annex A notice. Our Annex A notice generator fills it in for you. The form asks for your account number, service address, system type, panel capacity, inverter capacity and installation date.
  6. Keep copies of the permit, the notice and your equipment papers.

The circular treats the notice as a post-installation step for connected systems. Some DUs may have their own forms or portals, so check their site first.

What if your system exports by accident?

If you are connected, the circular says you must keep your export control working at all times. If it fails, that breaks the rule, and the DU can ask for corrective steps and extra protection. Any power that leaks out earns no credit at all. Only a net-metering agreement makes exports earn a credit. The circular also puts the risk of downtime or underperformance on the owner, so a good installer and a tested limiter matter.

What about micro-solar?

A micro-solar system (MSS) is a small plug-and-play kit. It can have up to 1,000 W of panels and a factory-set micro-inverter of no more than 800 W with automatic anti-islanding protection. It connects through a standard household circuit, and the installation must follow the PEC. You send your DU a notice, but you do not need a building permit or an ERC certificate. If your meter is an old analog one, the DU has 12 months from your notice to replace it, and the meter’s net reading is the basis for billing in the meantime.

Zero-export or net metering?

Zero-export is the simpler path if you use most of your power at home. Net metering makes sense if you want credit for power you send out, and you accept the lower export credit and the longer paperwork. Our guide to how net metering works compares the two. You can switch later: the circular tells DUs to guide users who move from zero-export to net metering.

What is still unsettled?

  • The circular tells the ERC to issue supporting rules within 90 days, including a simple one-transaction COC process, and says it may adjust older ERC rules. We have not confirmed that those rules are out yet.
  • The DOE and DILG were told to set uniform LGU guidelines within 60 days. We have not confirmed those either, so permit practice may still differ by city.
  • The circular also asks the DOE to work with the DTI on mandatory product certification for solar parts. A separate DTI proposal exists but was still a proposal when we last checked.

Frequently asked questions

What is a zero-export solar system?

A zero-export solar system (ZESS) is a solar system for your own use that sends no power to the grid. It is either connected to the grid with a control that blocks exports, or fully off-grid. The Department of Energy defined it in Department Circular DC2026-08-0017 in August 2026.

Do I need an ERC certificate of compliance for a zero-export system at home?

No. The circular waives the ERC certificate of compliance (COC) for zero-export systems used by households, clinics and hospitals. Other users, such as businesses, still need one.

Do I have to tell my electric company?

If your system is connected to the grid, yes. You send the DU a one-page notification form (Annex A of the circular). If your system is fully off-grid, no notice is needed.

Do I still need a building permit?

Yes for connected and off-grid zero-export systems, unless your LGU confirms that your existing building permit already covers the work. In that case you submit a copy of that permit. Micro-solar systems of 1 kW or less do not need a building permit.

Can I add a battery to a zero-export system?

The circular does not mention batteries either way. What counts is that the system is own-use and cannot export to the grid. Ask your DU and LGU how they treat hybrid inverters with batteries before you buy.

What happens if my system accidentally exports power?

Exported power earns no credit. If the export control stops working, that breaks the circular, and the DU can ask you to fix it and add protection. Only a net-metering agreement makes exports earn a bill credit.

Does this apply to condos and subdivisions?

The circular tells the DOE to work with the housing agency (DHSUD) so that condos, homeowners associations and building managers do not block installs without proof of structural or safety risk. Check your own association’s rules and ask in writing.

Ready to size your zero-export system?

Pick your bill and see the parts. Then fill in your DU notice.

Build my setupMake my DU notice

Sources and last checked

Checked November 22, 2026. SunTipid is not a law firm and this is not legal advice. Confirm details with your DU and LGU before you buy or install.

  • DOE Department Circular No. DC2026-08-0017, Policy Guidelines for Self-Generating Facility Zero-Export Solar Systems and Micro-Solar Systems for Own-Use, from the DOE circular page.
  • Coverage: GMA News.
  • Philippine Electrical Code 2017, Article 6.90 (solar PV).